Home > MANUFACTURE PROCESS > Reliability Test  
 
 
  Reliability Test Room
  ESD TEST
ESD TEST
Method : The DC jack, flat socket and exposed gap
............. => ¡¾ 8KV Contact / ¡¾ 15KV Air Discharge 3 times each
Requirement : Output Voltage, LED operation, Must be Charged.
 
Drop Test 1 Drop Test 2
  DROP TEST
Method : Drop Mobile Saver
............. 76cm height per 6 side
Requirement : Output Voltage, LED Operation and
.................... No Crack.
  VIBRATION TEST
Method : Frequency : 10~150 Hz , Acceleration : 1.0g,
............. Time 20 Mins/axis, Direction : X,Y,Z axis/each
Requirement : Output Voltage, LED operation and No problem of
.................... appearance.
  LIFE TEST
Method : DC In and DC Out plug
............. => Put in and Pull out test
............. 10 Cycles/Min => 2,000 cycles.
Requirement : No problem of Cable and Operation of
.................... Mobile Saver.
Constant Temp. & Humid. Chamber
  High Temperature Operation TEST
Method : Put fully charged Mobile Saver in Constant Temp. & Humid.
............. Chamber
............. Set +70¡¾2¡ÆC and 72 hours on the Chamber and it¡¯s a cycle.
............. Repeat 3 cycles
Requirement : Output Voltage, LED Operation, Must be charged.

Low Temperature Operation TEST
Method : Put fully charged Mobile Saver in Constant Temp. & Humid.
............. Chamber
............. Set -35¡¾2¡ÆC and 72 hours on the Chamber and it¡¯s a cycle.
............. Repeat 3 cycles.
Requirement : Output Voltage, LED Operation, Must be charged.

High Humidity TEST
Method : Put fully charged Mobile Saver in Constant Temp. & Humid.
............. Chamber.
............. Set +45¡¾2¡ÆC , Humidity : 70 ~ 75% and 72 hours (It¡¯s a
............. cycle.) on the Chamber.
............. Repeat 3 cycles.
Requirement : Output Voltage, LED Operation, Must be charged.\
Thermal shock Test Chamber
  Thermal Shock TEST
Method : Put fully charged Mobile Saver in Thermal Shock Test
............. Chamber.
............. Set -20¡É and 30 mins (Step 1) / + 85¡É and 30 mins
............. (Step 2) on the Chamber.
............. Progress Step 1 and 2 and it¡¯s a cycle.
............. Repeat 100 cycles.
Requirement : Output Voltage, LED Operation, Must be charged.
 
Salt Water Spray Test Chamber
  Corrosion TEST
Method : Put fully charged Mobile Saver in
............. Salt Water Spray
............. Test Chamber.
............. Set +35¡É, 5% salt and 8 hours
............. on the Chamber.
Requirement : Operation of Mobile Saver
............. and No corrosion on the PCB.
 
Life Cycle Test   X-ray Apparatus